Malaga → Bilbao
Today's conditions on this route
- 97 g/kWh
- 64% renewable
- 21°C · normal
- 97 g/kWh
- 64% renewable
- 15°C · normal
Grid: energy-charts · Weather: open-meteo.com
Range by Weather Condition
In normal weather 24 of 24 EV models complete this route. Estimated charging stops among them: 2 to 8 (median 3).
Select a vehicle above to explore weather-adjusted range.
Assumptions behind these numbers
- Model assumptionStart charge 100%, arrive with 15% in reserve, charge up to 80% at each stop.
- Model assumptionUsable battery: 100% of each vehicle's listed capacity (the listed capacity may be gross or net; no correction is applied).
- Model assumptionSpeed: consumption starts from each vehicle's listed real-world efficiency, times a speed factor of 1.00 (1.00 = no speed adjustment).
- Vehicle dataWeather: each vehicle uses its own hot, normal and cold factor from our vehicle data, so consumption = efficiency x 1.00 / factor. Hot is 25 °C and above, normal is 10-25 °C, cold is below 10 °C.
- Model assumptionCharging speed: average power = min(vehicle peak kW, 150 kW cap) x 0.60 taper, plus 5 min per stop.
- MethodRange, energy and cost all use the same consumption figure. Energy is measured at the battery; charging losses are not included.
- MethodCharging stops are estimated from range and the charging window. They are not verified charging stations.
- Market dataCost: not shown, because no electricity market price is available for Spain.
- Market dataCO2: energy x grid average carbon intensity of 97 g/kWh (Spain, energy-charts, as of 13 Nov 2026).
More EV Routes in Spain
See all Spain routes →Route analysis
The Malaga to Bilbao route covers 921 km and requires roughly 620 minutes of driving, a long north-south traverse across Spain without any border crossing. Both cities have normal climates, so temperature extremes are unlikely to distort consumption significantly, though the route's length means most EVs will need multiple charging stops regardless of battery size. Drivers should still account for the approximately 10-hour drive time plus charging overhead, making an overnight break sensible. The absence of cross-border complications simplifies planning, as no additional documentation or connector standards apply. This route suits EVs with moderate range provided charging is factored into the schedule.