Bangalore → Pune
Latest grid data on this route
- 568 g/kWh
- 28% renewable
- 21°C · normal
- 568 g/kWh
- 28% renewable
- 25°C · normal
Grid: Ember Climate · Weather: open-meteo.com
Range by Weather Condition
In normal weather 1 of 24 EV models complete this route. Estimated charging stops among them: 1 to 1 (median 1).
Select a vehicle above to explore weather-adjusted range.
Assumptions behind these numbers
- Model assumptionStart charge 100%, arrive with 15% in reserve, charge up to 80% at each stop.
- Model assumptionUsable battery: 100% of each vehicle's listed capacity (the listed capacity may be gross or net; no correction is applied).
- Model assumptionSpeed: consumption starts from each vehicle's listed real-world efficiency, times a speed factor of 1.00 (1.00 = no speed adjustment).
- Vehicle dataWeather: each vehicle uses its own hot, normal and cold factor from our vehicle data, so consumption = efficiency x 1.00 / factor. Hot is 25 °C and above, normal is 10-25 °C, cold is below 10 °C.
- Model assumptionCharging speed: average power = min(vehicle peak kW, 150 kW cap) x 0.60 taper, plus 5 min per stop.
- MethodRange, energy and cost all use the same consumption figure. Energy is measured at the battery; charging losses are not included.
- MethodCharging stops are estimated from range and the charging window. They are not verified charging stations.
- Market dataCost: not shown, because no electricity market price is available for India.
- Market dataCO2: energy x grid average carbon intensity of 568 g/kWh (India, Ember Climate, Monthly average, May 2026, older than 45 days, last available value).
More EV Routes in India
See all India routes →Route analysis
The 837-kilometer drive from Bangalore to Pune, with a drive duration of 606 minutes, presents a significant single-day challenge for an electric vehicle driver. Drivers should plan for at least one or two charging stops, as the distance well exceeds the real-world range of most current EVs under highway speeds. The route is not cross-border, which simplifies planning. The terrain between the two cities includes sections of the Western Ghats, which may increase energy consumption on uphill gradients, requiring drivers to monitor their state of charge closely when approaching higher elevations.