Venice → Trieste
Today's conditions on this route
- 315 g/kWh
- 35% renewable
- 14°C · normal
- 315 g/kWh
- 35% renewable
- 15°C · normal
Grid: energy-charts · Weather: open-meteo.com
Range by Weather Condition
In normal weather 24 of 24 EV models complete this route. Estimated charging stops among them: 0 to 1 (median 0).
Select a vehicle above to explore weather-adjusted range.
Assumptions behind these numbers
- Model assumptionStart charge 100%, arrive with 15% in reserve, charge up to 80% at each stop.
- Model assumptionUsable battery: 100% of each vehicle's listed capacity (the listed capacity may be gross or net; no correction is applied).
- Model assumptionSpeed: consumption starts from each vehicle's listed real-world efficiency, times a speed factor of 1.00 (1.00 = no speed adjustment).
- Vehicle dataWeather: each vehicle uses its own hot, normal and cold factor from our vehicle data, so consumption = efficiency x 1.00 / factor. Hot is 25 °C and above, normal is 10-25 °C, cold is below 10 °C.
- Model assumptionCharging speed: average power = min(vehicle peak kW, 150 kW cap) x 0.60 taper, plus 5 min per stop.
- MethodRange, energy and cost all use the same consumption figure. Energy is measured at the battery; charging losses are not included.
- MethodCharging stops are estimated from range and the charging window. They are not verified charging stations.
- Market dataCost: not shown, because no electricity market price is available for Italy.
- Market dataCO2: energy x grid average carbon intensity of 315 g/kWh (Italy, energy-charts, as of 13 Nov 2026).
More EV Routes in Italy
See all Italy routes →Route analysis
The Venice to Trieste route covers 160 km and takes about 114 minutes by car, entirely within Italy with no border crossing. For EV drivers, the corridor is well provisioned: the density of en-route charging means range anxiety is minimal on a trip that sits comfortably within the capability of most modern EVs, and the 114-minute drive time makes it feasible without a mandatory charging stop. The disparity between the two endpoints matters for planning. Both cities have normal climates, so temperature-related range reduction is not a major planning factor. The absence of a border crossing simplifies the journey, removing concerns about cross-country charging standards or payment compatibility. Drivers can treat this as a straightforward regional trip where charging infrastructure is an asset rather than a constraint.