Strasbourg → Bordeaux
Today's conditions on this route
- 28 g/kWh
- 31% renewable
- 10°C · normal
- 28 g/kWh
- 31% renewable
- 17°C · normal
Grid: energy-charts · Weather: open-meteo.com
Range by Weather Condition
In normal weather 24 of 24 EV models complete this route. Estimated charging stops among them: 2 to 9 (median 3).
Select a vehicle above to explore weather-adjusted range.
Assumptions behind these numbers
- Model assumptionStart charge 100%, arrive with 15% in reserve, charge up to 80% at each stop.
- Model assumptionUsable battery: 100% of each vehicle's listed capacity (the listed capacity may be gross or net; no correction is applied).
- Model assumptionSpeed: consumption starts from each vehicle's listed real-world efficiency, times a speed factor of 1.00 (1.00 = no speed adjustment).
- Vehicle dataWeather: each vehicle uses its own hot, normal and cold factor from our vehicle data, so consumption = efficiency x 1.00 / factor. Hot is 25 °C and above, normal is 10-25 °C, cold is below 10 °C.
- Model assumptionCharging speed: average power = min(vehicle peak kW, 150 kW cap) x 0.60 taper, plus 5 min per stop.
- MethodRange, energy and cost all use the same consumption figure. Energy is measured at the battery; charging losses are not included.
- MethodCharging stops are estimated from range and the charging window. They are not verified charging stations.
- Market dataCost: estimated energy cost at the average electricity market price for France, day-ahead market, as of 16 Nov 2026 (0.143 EUR/kWh); public charging tariffs are usually higher.
- Market dataCO2: energy x grid average carbon intensity of 28 g/kWh (France, energy-charts, as of 16 Nov 2026).
More EV Routes in France
See all France routes →Route analysis
The Strasbourg to Bordeaux route covers 966 km with an estimated driving time of 607 minutes, a long domestic French corridor that crosses no international border. Because the drive exceeds typical single-charge range, drivers should plan at least one or two charging stops, and the density of en-route infrastructure makes that scheduling flexible rather than restrictive. The absence of a border crossing simplifies planning, as no additional documentation or connector standards apply. For practical purposes, this route suits EV drivers who prefer corridor charging over destination charging, though the 607-minute drive time means total trip duration will depend heavily on charging speed and dwell time at each stop.