Montpellier → Bordeaux
Today's conditions on this route
- 49 g/kWh
- 24% renewable
- 16°C · normal
- 49 g/kWh
- 24% renewable
- 9°C · cold
Grid: energy-charts · Weather: open-meteo.com
Range by Weather Condition
In normal weather 24 of 24 EV models complete this route. Estimated charging stops among them: 0 to 4 (median 1).
Select a vehicle above to explore weather-adjusted range.
Assumptions behind these numbers
- Model assumptionStart charge 100%, arrive with 15% in reserve, charge up to 80% at each stop.
- Model assumptionUsable battery: 100% of each vehicle's listed capacity (the listed capacity may be gross or net; no correction is applied).
- Model assumptionSpeed: consumption starts from each vehicle's listed real-world efficiency, times a speed factor of 1.00 (1.00 = no speed adjustment).
- Vehicle dataWeather: each vehicle uses its own hot, normal and cold factor from our vehicle data, so consumption = efficiency x 1.00 / factor. Hot is 25 °C and above, normal is 10-25 °C, cold is below 10 °C.
- Model assumptionCharging speed: average power = min(vehicle peak kW, 150 kW cap) x 0.60 taper, plus 5 min per stop.
- MethodRange, energy and cost all use the same consumption figure. Energy is measured at the battery; charging losses are not included.
- MethodCharging stops are estimated from range and the charging window. They are not verified charging stations.
- Market dataCost: estimated energy cost at the average electricity market price for France, day-ahead market, as of 13 Nov 2026 (0.202 EUR/kWh); public charging tariffs are usually higher.
- Market dataCO2: energy x grid average carbon intensity of 49 g/kWh (France, energy-charts, as of 13 Nov 2026).
More EV Routes in France
See all France routes →Route analysis
The Montpellier to Bordeaux route covers 486 km with a driving time of 307 minutes, entirely within France and without any border crossing. Both endpoints have normal climates and are not classified as glamour EV cities. For EV drivers, this density means the 486 km journey can be completed with one or two charging stops depending on vehicle range and starting charge, with ample fallback options if a preferred station is occupied or out of service. The roughly five-hour drive time excludes charging, so drivers should budget additional minutes for stops. Because the corridor is well supplied with infrastructure, range anxiety is limited, though drivers should still confirm connector compatibility and station status before departure. The absence of a border crossing simplifies planning, as no additional documentation or plug standard changes apply.