Lyon → Nantes
Today's conditions on this route
- 28 g/kWh
- 31% renewable
- 13°C · normal
- 28 g/kWh
- 31% renewable
- 16°C · normal
Grid: energy-charts · Weather: open-meteo.com
Range by Weather Condition
In normal weather 24 of 24 EV models complete this route. Estimated charging stops among them: 1 to 6 (median 2).
Select a vehicle above to explore weather-adjusted range.
Assumptions behind these numbers
- Model assumptionStart charge 100%, arrive with 15% in reserve, charge up to 80% at each stop.
- Model assumptionUsable battery: 100% of each vehicle's listed capacity (the listed capacity may be gross or net; no correction is applied).
- Model assumptionSpeed: consumption starts from each vehicle's listed real-world efficiency, times a speed factor of 1.00 (1.00 = no speed adjustment).
- Vehicle dataWeather: each vehicle uses its own hot, normal and cold factor from our vehicle data, so consumption = efficiency x 1.00 / factor. Hot is 25 °C and above, normal is 10-25 °C, cold is below 10 °C.
- Model assumptionCharging speed: average power = min(vehicle peak kW, 150 kW cap) x 0.60 taper, plus 5 min per stop.
- MethodRange, energy and cost all use the same consumption figure. Energy is measured at the battery; charging losses are not included.
- MethodCharging stops are estimated from range and the charging window. They are not verified charging stations.
- Market dataCost: estimated energy cost at the average electricity market price for France, day-ahead market, as of 16 Nov 2026 (0.143 EUR/kWh); public charging tariffs are usually higher.
- Market dataCO2: energy x grid average carbon intensity of 28 g/kWh (France, energy-charts, as of 16 Nov 2026).
More EV Routes in France
See all France routes →Route analysis
The Lyon to Nantes route covers 684 km with a driving time of 430 minutes, entirely within France and without any border crossing. For EV drivers, this density means the 684 km trip can be planned around multiple charging stops, though the lower station count in Nantes suggests arriving with sufficient charge is prudent rather than relying on destination charging alone. The 430-minute drive time implies roughly seven hours of continuous driving, so practical planning should account for at least one substantial charging and rest stop. Both cities have normal climates, and neither is flagged as a glamour EV city, so the route is a conventional domestic corridor rather than a showcase market. The absence of a border crossing simplifies documentation and payment considerations, since drivers remain within a single national charging network context throughout the journey.