Delhi → Nagpur
Latest grid data on this route
- 568 g/kWh
- 28% renewable
- 19°C · normal
- 568 g/kWh
- 28% renewable
- 26°C · hot
Grid: Ember Climate · Weather: open-meteo.com
Range by Weather Condition
Our route data does not list any of the EV models we track as completing this route in normal weather. The charging-stop and time figures below are model estimates only.
Select a vehicle above to explore weather-adjusted range.
Assumptions behind these numbers
- Model assumptionStart charge 100%, arrive with 15% in reserve, charge up to 80% at each stop.
- Model assumptionUsable battery: 100% of each vehicle's listed capacity (the listed capacity may be gross or net; no correction is applied).
- Model assumptionSpeed: consumption starts from each vehicle's listed real-world efficiency, times a speed factor of 1.00 (1.00 = no speed adjustment).
- Vehicle dataWeather: each vehicle uses its own hot, normal and cold factor from our vehicle data, so consumption = efficiency x 1.00 / factor. Hot is 25 °C and above, normal is 10-25 °C, cold is below 10 °C.
- Model assumptionCharging speed: average power = min(vehicle peak kW, 150 kW cap) x 0.60 taper, plus 5 min per stop.
- MethodRange, energy and cost all use the same consumption figure. Energy is measured at the battery; charging losses are not included.
- MethodCharging stops are estimated from range and the charging window. They are not verified charging stations.
- Market dataCost: not shown, because no electricity market price is available for India.
- Market dataCO2: energy x grid average carbon intensity of 568 g/kWh (India, Ember Climate, Monthly average, May 2026, older than 45 days, last available value).
More EV Routes in India
See all India routes →Route analysis
This imbalance means drivers must carefully plan their final charging stop to ensure they arrive with sufficient range. The hot climate in both cities does not typically cause the severe range reduction associated with cold weather, but sustained high temperatures can still degrade battery efficiency over the 790-minute drive. Given the distance, at least one or two charging stops are necessary, and drivers should verify that the route-based stations are operational and compatible with their vehicle. This route is not cross-border, simplifying charging logistics, but the journey still demands rigorous pre-trip planning to avoid range anxiety.